Subway runs on BuiltOS.

Built for operators who put roof and exterior work out to tender without a surveyor on staff. Areas, falls and lengths are read off the model geometry rather than approximated.

  1. The roof412 square metres, measured off the model
  2. Sub oven on the lineBlower motor, converter and door seal
Read the article
Inside BuiltOS

Three views of this restaurant.

  • Subway in BuiltOS: the dining room through the front glassThe 3D model

    Tour of the 3D model

    A walk through the finished 3D model — levels, rooms and everything placed inside them.

  • Subway in BuiltOS: the logo wallThe 3D model

    Dropping materials onto faces

    Picking the dining floor, the service counter or the roof deck and applying a finish to it.

  • Subway in BuiltOS: the logo wall over the lineThe 3D model

    Tools: measure, inspect, furnish

    Measuring the roof, opening a line asset from the floor plan and placing new equipment at true size.

Overview

A roof needs doing, so three contractors come out. One paces it, one works off an old drawing, one measures it properly, and the three numbers that come back are not comparable. The cheapest is usually the one who measured the least. Nobody is being dishonest: there is no single measurement any of them can work from, so each produces his own and prices against it. In the 3D model the roof is one surface with one area, and everyone bids the same piece of work.

Subway: Oven 1, asked why it keeps cutting out mid-bake
Subway · Oven 1, asked why it keeps cutting out mid-bake

The request is a scope the roofing contractor can price without walking the building first. The copilot isolates the roof and reads it off the model: 412 square metres of two-ply modified bitumen, falling at 1:50 to four internal drains, eleven penetrations and thirty-eight metres of parapet. That goes out as a report he prices against, and the details that cost money — the penetrations, the falls, the parapet — are named in the scope before anyone visits. The numbers are read, not estimated.

Subway: Oven 1: what it has cost, and what comes next
Subway · Oven 1: what it has cost, and what comes next
Drawings Geometry Room Data Assets Warranties Records Transfer WORK ORDERS Dispatch Ownership Capital Drawings Geometry Room Data Assets Warranties Records Transfer WORK ORDERS Dispatch Ownership Capital
What it produces

One record for every asset, in 3D when it helps

  • The KFC restaurant in 3DMap

    Drawings and BIM become a measured 3D model

    KFC, from its own drawings. How we measure

  • Soda Machine 2 at Burger King, its record open in the 3D modelManage

    Every asset carries its own status and history

    Burger King’s Soda Machine 2, open where it stands.

  • Fuel Pump 4 at Shell: what it has cost, and the forecastImprove

    Price renovations from the 3D model

    Shell’s Fuel Pump 4: cost so far, and what to replace and when.